Custom Home Building FAQ: Hermosa Beach and Manhattan Beach

Answers from Levine Homes Real Estate and Construction on build time, cost per square foot, permits, the Coastal Zone, and how we build.

Common Questions

Custom home building questions.

Straight answers from a licensed builder and broker.

How long does it take to build a custom home in Hermosa Beach?

Levine Homes Real Estate and Construction averages about 16.2 months in Hermosa Beach, from permit issued to final inspection. Hermosa Beach city records for 25 new homes over the last five years average about 23.2 months. Manhattan Beach records for 93 homes average about 27.2 months. Before construction starts, design takes about 4 to 6 months and city permit processing averages about 15 months, with a range from about 9 months to 2 years. Permit time varies with Coastal Zone status and time of year. See the city permit data for Manhattan Beach and Hermosa Beach.

How much does it cost per square foot to build a custom home in Hermosa Beach or Manhattan Beach?

Custom homes in Hermosa Beach and Manhattan Beach generally run from about $550 to $1,300 per square foot to build, before land, design, permits and fees. Finish level, lot size and slope, a basement, landscaping, a pool, and house style move a project through that range. A basement costs more and adds time because nothing else can start until it is finished. Contemporary homes with large areas of glass, steel and open space usually cost more.

What are the steps from buying a lot to moving in?

Start the survey and soils report during escrow, which takes about 1 to 1.5 months. The architect then designs the home over about 4 to 6 months, and the engineer finishes their work. City permit processing comes next and averages about 15 months in our experience, with a range from about 9 months to 2 years. Construction then takes about 19.4 months for Levine Homes Real Estate and Construction on our Manhattan Beach homes and 16.2 months on our Hermosa Beach homes. Those are our own averages, not the citywide averages, which are about 27.2 months for 93 homes in Manhattan Beach and 23.2 months for 25 homes in Hermosa Beach. Making design selections before plans are approved is the best way to avoid delays.

How is building in the Coastal Zone different in Hermosa Beach?

In Hermosa Beach, projects in the Coastal Zone need approval from both the city and the California Coastal Commission. The Coastal Zone is not a set distance from the water. It zigzags through the city, so one street can be inside it and the next street over can be outside it. Inside the zone, a project gets city planning approval first, then Coastal Commission approval, which takes about 4 to 6 months when the project qualifies for a waiver of permit, and can take much longer if Coastal Commission staff requires a full permit, and then returns to the city for permitting. Check the zone map for your specific lot.

Why does Levine Homes Real Estate and Construction build faster than other builders?

We build only 2 to 3 homes at a time, so each one gets close attention to timing and sequence. We have electricians and plumbers on staff, so underground plumbing and electrical go in while the foundation is being formed instead of waiting for subcontractors. We finish the design package before construction starts, which avoids removing and reinstalling work. We order lighting and plumbing fixtures early and store them in our Torrance warehouse, because lights can take 4 to 6 months to arrive and selections can become unavailable.

How does hiring a builder who is also a broker help when buying a lot?

We hold a California general contractor license (CSLB B-985034) and a real estate broker license (DRE 01928630). Before you buy, we can tell you what can be built on a lot, how long it will take, and what view you are likely to keep after you build or after a neighbor builds. We check trees, utilities and slope. A small slope may need no retaining wall or shoring, while another can add hundreds of thousands of dollars and months of work. If you are buying a house to remodel, we read the inspection report, explain each item, and estimate repair costs.

Can you help me find a home and remodel it to fit what I need?

Yes. One client could not find a home with enough bedrooms. We found a house with a loft, showed her it could become another bedroom, and handled the remodel, including removing asbestos and a popcorn ceiling. Because we are builders and brokers, we can judge what is possible before you make an offer, and our crews can start repairs and improvements quickly after inspections.

What do you build differently in the walls and floors?

We have used ZIP System sheathing on every new build since 2021. Most homes use plywood or OSB (oriented strand board) sheathing with a separate barrier added later. ZIP System has the waterproof layer built in, so the house becomes weather-tight sooner and interior work can start earlier. Huber states that ZIP System sheathing can be exposed for up to 180 days, while standard Exposure 1 OSB is designed for construction delays and is not suitable for long-term exposure. We often add Tyvek over the ZIP as a second membrane. For flooring we use Advantech, which we find much stiffer than typical plywood.

How do you protect a home near the ocean from salt air and water?

We avoid galvanized steel and use copper or stainless steel, which resist corrosion and need little maintenance. We use James Hardie fiber cement shingles, which cost more upfront but do not rot and degrade more slowly than many alternatives. A second membrane over the ZIP System gives backup if one waterproofing layer fails. After windows are installed, we pay our crew a bounty for finding window leaks, so problems are found before finishes cover them.

What should I ask a custom home builder in the South Bay before hiring them?

Ask whether they have built in the South Bay. Local builders know how to work with small delivery trucks and little room to stage materials, high water tables and liquefaction, and salt air. One of our current Hermosa Beach projects has water about 7 feet below the foundation. Ask whether they know the city's inspection steps, since that project has had 10 inspections before the foundation is finished. Ask whether the owner will be on site. At Levine Homes Real Estate and Construction, Mike Levine is on site multiple times a week. Ask how you will see progress. We use JobTread, which gives homeowners daily logs with photos, the schedule, and a budget updated about weekly.