Permitting and the demolition sequence
Hermosa Beach requires the new-construction permit to be approved before a demolition permit is issued. Setbacks, height limits, coastal requirements, and design standards also vary by location. We structure the plan and submission to reduce avoidable delays while protecting usable square footage.